CHINA MACHINERY INDUSTRY FIFTH CONSTRUCTION CORP INC.

Indonesia Baturaja Project

Construction Site: The Republic of Indonesia  Construction Time: 2016

Indonesia Papua 20 MW Coal Fired Power Station Project

Construction Site: The Republic of Indonesia  Construction Time: 2015

Indonesia South Kalimantan Conch Phase 2 Project

Construction Site: The Republic of Indonesia  Construction Time: 2015

Myanmar Mawlamyine MCL 2x20 MW Coal Fired Power Station Project

Construction Site: the Republic of the Union of M  Construction Time: 0

Thailand TPIPL Company Cement Production Line Project

Construction Site: the Kingdom of Thailand  Construction Time: 0

Thai Cement WHR-PG Project

Construction Site: the Kingdom of Thailand  Construction Time: 0

Thailand Asia Cement WHR-PG Project

Construction Site: the Kingdom of Thailand  Construction Time: 0

Guyana Skelton Output 8400ton/day Sugar Plant

Construction Site: 圭亚那  Construction Time: 2005

Korea Shuang Long Bus Production Line

Construction Site:  Construction Time: 0

BOANDA Bridge Production line Disassembled from Korea Wen Yang

Construction Site:  Construction Time: 0

Thailand General Contracting Steam Turbine Civil Plant

Construction Site:  Construction Time: 0

Malaysia Mega Steel Plant

Construction Site:  Construction Time: 0