June 6 to 7, 2017, company production deputy general manager Liu Xulong and his team lead the safety department, technical quality department, project management department related employees making integrated inspection in Huaibei Zhongcheng Cement Project.
General manager Liu inspected the site from AQC boiler to the kiln tower top, made inspection and guidance about the safety risks and quality defects, gave arrangement to the site construction management and scheduling, and carried out a careful audit on quality and monthly safety material preparation. In the project meeting, he required the project department to make a good site quality monitoring, a good coordination in the progress of cost, make good basic report, and pointed to do a good job and supervision and communication for work coordination with the project owner. And called everybody to take the advantage of the safety moment to carry out training, hidden problem investigation, emergency drill, and other useful activity for the operation, persistently do the safety works.